Wesleyan University – Natatorium Renovations

Overview

PAC Group was awarded the refurbishment project of Wesleyan University’s Freeman Athletic Center Natatorium. The Natatorium was constructed in 1990 and is the home of Wesleyan’s men’s and women’s swimming and diving teams with a 50-meter X 25 yard pool. It has nine lanes available for collegiate meets and seven lanes for long-course events. The scope of the project included dewatering the pool, reconfiguring the existing men’s shower room and adjacent pool storage room to add an all gendered toilet/shower room with access from the pool deck, removal of the below surface observation window and pit, tile repair/replacement, improve ventilation within the chemical storage room, addition of a new UV sanitation system, a new entrance to the filter room, and replacement of the pool filter and chemical control equipment. PAC Group has worked with Wesleyan on over 24 projects and and is proud to partner with them once again.