Overview
PAC Group was hired as the Construction Manager for the Extra Space Storage facility in Tolland.
The project included renovating an existing 56,200 SF single-story facility and building a new 23,500 SF addition.
The scope of work included new mechanical, plumbing and HVAC systems, new electrical service
within the existing building and down-sizing of the existing electrical service. Modifications
were made to the existing sprinkler system and extensions into the new addition.
A new roof was installed on the existing building. Work also included site work,
drainage, paving and utilities as well as new landscaping.